Production on the bulk of the Technicolor sequences was a long and cumbersome process that ran for over six months, from October 1938 to March 1939. Most of the actors worked six days a week and had to arrive at the studio as early as 4:00 or 5:00 a.m to be fitted with makeup and costumes, and would not leave until 7:00 or 8:00 p.m. Cumbersome makeup and costumes were made even more uncomfortable by the daylight-bright lighting the early Technicolor process required, which could heat the set to over 100 °F (37.8 °C).
Scritto da il
05-03-2025 alle ore 08:01