During the opening lift (elevator) sequence, as the roof crane gives way under the strain of the falling lift, the vertical and horizontal components of the crane are seen separating but subsequent shots show the complete assembly crashing through the air vent and catching against the steel beam.
Scritto da il
05/03/2025 alle ore 07:59