They mention the "large" delivery of 355 metric tonnes of concrete with 218 trucks. Apart from the fact that wet concrete is usually referred to in volume, not weight, the calculation of trucks needed for this weight is wrong. The mixing trucks on average hold 18 tons of concrete each, meaning that they only need 20 trucks.
Scritto da il
05/03/2025 alle ore 07:45